How to verify ventilation savings with before and after sensor data
Savings verification compares energy use before and after a ventilation change, adjusted for weather and occupancy. IPMVP options, baseline length and the sensor pitfalls that distort the comparison.
Savings verification for a ventilation change compares measured energy use after the change with what the building would have used without it. The second number cannot be measured, so it is built from a baseline, the 'before' case, and adjusted to the conditions of the 'after' period. The US Department of Energy's M&V Guidelines (version 5.0, September 2024) apply the International Performance Measurement and Verification Protocol (IPMVP). They define measurement and verification (M&V) as 'the process of quantifying the energy or water performance and cost savings.'
The Department of Energy's federal technology alert on CO2-based demand-controlled ventilation (DOE/EE-0293, field data from the early 2000s) reports that none of the building operators interviewed had measured energy consumption before and after installing the CO2 sensors. Without that comparison, savings verification has not happened and the figure is a forecast.
Pick the measurement boundary first
The DOE guidelines list four IPMVP options. Option A isolates the retrofit and is based on a combination of measured and estimated factors. Option B also isolates the retrofit and is based on short-term, periodic or continuous measurement of baseline and post-retrofit energy use. Option C is based on continuous measurement of whole-facility energy consumption, for example from utility billing data. Option D uses computer simulation to model the energy performance of a whole facility or sub-facility. EVO, which publishes the protocol, describes Option D as the approach when baseline or reporting-period data are unreliable or unavailable, such as in new construction.
General reasoning, not from the guidelines: a change to one air handler fits Option A or B, because the fan, the heating coil and the cooling plant it affects can each be metered or estimated inside a boundary. A whole-building bill includes everything else that moves during the year, and a ventilation change in part of a building can fall below the 10 to 15% level. Savings from lower airflow also show up in heating and cooling energy, so the boundary has to cover the fan, the coils and the plant behind them.
How long the baseline needs to be
The DOE guidelines say baseline data should reflect the most relevant operating conditions. For Option C they ask for at least 12 months of pre-installation data, with 24 or more preferred, to capture seasonal variation, and at least 9 months (preferably 12) of data after the change to calculate annual savings. Shorter baselines have been studied for demand-controlled ventilation retrofits in smaller commercial buildings. A Purdue University dissertation (Lawrence, 2004) found training periods of two days to one week sufficient for estimating the difference in energy cost before and after a retrofit, for an economic evaluation. It found that up to eight weeks might be necessary for a detailed engineering evaluation or measurement and verification, and that a site with highly variable occupancy, such as a restaurant, might need at least eight weeks to model CO2 levels accurately.
Weather is the usual routine adjustment. The DOE guidelines define routine adjustments as accounting for expected variations in independent variables such as weather, often through regression analysis. Occupancy and operating hours appear as examples of static factors behind non-routine adjustments, which cover changes nobody planned for. The M&V plan should list such events and the thresholds that trigger an adjustment. LBNL's Site-Level NMEC Technical Guidance for California programs (normalized metered energy consumption, a whole-building method; version 2.0, December 2019) says the importance of non-routine adjustments for events during the performance period cannot be over emphasized. In PNNL's re-evaluation of eight dedicated outdoor air system sites (PNNL-34419, December 2023), energy use was weather normalized on an annual basis by the ratio of average to actual degree days.
Savings verification needs the same sensors and conditions
Savings verification by before and after comparison can be distorted when the instrument changes between the two periods. In an LBNL study of 208 CO2 sensors in 34 commercial buildings, 40% were off by more than 75 ppm at about 1,010 ppm and 13% were off by more than 300 ppm. The Department of Energy alert says calibration drift has been observed to be a problem in some sensors and recommends checking calibration periodically against outdoor air during an unoccupied period. If a sensor is replaced or recalibrated between the baseline and the reporting period, the reading can shift while nothing changes in the room.
Practical suggestion, not a published finding: keep the same devices in the same positions, log every replacement and calibration, and compare all sensors with each other when the building is empty, the check a REHVA Journal article on commissioning demand-controlled ventilation describes. The IPMVP principles ask for the same discipline in broader terms: reporting that is consistent and comparable across different periods of time for the same project. Time resolution matters too. A PNNL re-tuning training chapter (PNNL-SA-92685, 2013) says meter profiles need hourly or 15-minute data to show when equipment runs, and monthly billing data does not show the time of use.
Report air quality next to energy
Lower airflow normally lowers energy use (general reasoning), so an energy result alone cannot show that the change was a good one. The Department of Energy alert quotes a controls company owner who warned that installing demand control in a chronically under-ventilated building might increase energy use. In that case the extra energy buys ventilation the building was missing. Cuts to outdoor air need a check against ASHRAE 62.1, as the PNNL Re-tuning Measure Guide advises. Reporting CO2 against its target during occupied hours for both periods (what is a good CO2 level in an office) shows which of the two cases applies.
Name the baseline with every figure
PNNL-34419 reports two savings figures for the same kind of project because it used two baselines. Against the site's previous system, measured in utility bills, the Seattle Airport site saved 73% in the first year after conversion and more than 75% over the continued period, according to the report text (the labels in the report's Figure 3 differ slightly). Against a modeled code-minimum replacement the modeled annual saving was 35% (Table 5). The report puts the gap down to the poor efficiency of the original system, which had a substantial amount of simultaneous heating and cooling, and notes that there is no limit to an existing system's inefficiency. Neither figure is wrong. They answer different questions, and a savings claim that does not name its baseline cannot be checked. The report also states that six of the eight sites had sufficient utility data for the before and after comparison.
The IPMVP principles say M&V procedures should be designed to responsibly estimate savings so that they are not overstated, and that reporting should consider all effects of a project. Savings verification also needs repeating: the DOE guidelines say short-term measurements should be repeated at least annually during the M&V process. The adding demand-controlled ventilation without a BMS article covers fixing the basics before a retrofit.