A building automation system can tie an owner to one vendor's controls, software and service for a long time. An HDR engineer (Lisowski, 2023) calls choosing a proprietary BMS a long-term commitment. The questions below are for the vendor or integrator before a contract is signed. A US scoping study by national laboratories (PNNL-22169) reports that about 10% of US buildings use a building automation system or central controls, and it says a significant portion of building energy is wasted because of missing controls or existing systems not being used properly. A practical suggestion: give questions about training and use as much weight as the specification.

What the building automation system will control

Ask for a list of functions for each service instead of a product name. Directive (EU) 2024/1275 defines a building automation and control system (BACS) as a system comprising all products, software and engineering services that can support energy-efficient, economical and safe operation of technical building systems such as space heating. Building automation for buildings without a BMS explains the definition.

EN ISO 52120-1:2022 gives a way to write the answer down. It grades automation in classes by the control functions reached for each service. A Buildwise article from Belgium describes four classes: D (energy-inefficient, to be avoided in new buildings), C (the reference, standard automation), B (advanced, with some specific building management functions and room controllers able to communicate with the central system) and A (high energy performance with full integration of systems). A REHVA page on the standard lists only A, B and C, so sources differ on the count. The standard itself is paywalled; the descriptions here come from those summaries.

An owner can write a required class into the tender. The REHVA page, published with eu.bac, describes audits that check concrete items, such as whether CO2 sensors are linked to ventilation and whether trend logs are recording. An eu.bac guide says the 2022 edition added a function for supply air flow at room level that depends on air quality demand, measured by CO2 or VOC. Ask the vendor which class the design reaches for each service and how that will be shown. Treat a savings figure with care. Buildwise gives a class B office a thermal factor of 0.80 against class C, which it reads as about 20% savings on heating, cooling and hot water, and calls this an approximation for a first assessment that needs proper commissioning and monitoring.

What EU rules ask of the system

Article 13(10) of the directive lists what a BACS must be able to do: continuously monitor, log, analyze and allow adjustment of energy use; benchmark efficiency and detect efficiency losses; communicate with connected technical building systems across manufacturers; and, by 29 May 2026, monitor indoor environmental quality. Article 13(9) sets the BACS requirement, where technically and economically feasible, for non-residential buildings with heating or air-conditioning (alone or combined with ventilation) rated above 290 kW (by 31 December 2024) or above 70 kW (by 31 December 2029), and national law decides the details. Article 13, as reproduced in an English copy of the directive, names no efficiency class. Buildwise says authorities can set a minimum class, so a class would come from a national requirement or from the owner's own specification.

Ask the vendor to map its functions to the paragraph 10 list in writing. A checklist report on this, PD CEN/TR 18276:2026, was published by BSI on 28 February 2026 for policy makers, planners, owners and inspectors. Whether a given system meets the rules for a given building is for the national text and a qualified engineer.

Open protocols and lock-in

Ask which protocols the system uses between controllers and to outside systems, and whether the products are BTL listed. BACnet is an open standard (ANSI/ASHRAE 135, ISO designation 16484-5), and BACnet and Modbus explained for building owners covers the protocol side. Open still leaves some dependence on a vendor. SmithGroup engineers (2020) write that an open BAS is not entirely open, because every vendor must tie into one head-end system, and advise that at least three local vendors should be capable and willing to bid the specification before an open BAS is specified.

On the proprietary side, an HDR engineer (2023) writes that choosing a proprietary BMS is a long-term commitment, and that switching later can mean replacing controllers, field devices, workstations and wiring. SmithGroup warns that proprietary systems make it difficult to add controls from other vendors and that some cannot be serviced by a third party. Ask who will hold the passwords, programming tools and as-built documentation, and whether another contractor can service the system.

Who maintains it, and who uses it

ACEEE's November 2025 brief on small and medium US commercial buildings lists barriers to better controls. Owners often lack the money, time and expertise; HVAC firms are set up to sell new systems but not controls; trained staff sometimes leave; and systems need proper installation and maintenance by well-trained contractors. Ask who services the system, who the named contact is, what response time is in the service agreement, and what happens if the integrator's technician leaves. Ask what training is included. Clemson University's standard, as one example of an owner's specification, asks for at least 40 hours of classroom and field training on capital projects.

One US field study looked at how installed controls were configured. DOE energy code webinar slides (March 2019, presented by Pacific Northwest National Laboratory) summarize a field study of 24 new US buildings that scored 14 code-required control measures on design, capability and configuration. In the slides' conclusions, 95% of observations were capable of compliance, but only 50% were fully configured. The study covers new buildings and those code-required controls only.

Data, security and the upgrade path

Article 16(1) of the directive asks Member States to ensure that building owners, tenants and managers can have direct access to their building systems' data, including data from building automation and control systems. Ask how the data leaves the system, in which format, at what cost and where it is stored. Clemson's standard says the university must own and be able to access all BMS data. SmithGroup adds that equipment should not rely on communication with the cloud alone.

A NIST blog post from August 2026 says that as building automation and control system networks are integrated with corporate networks and the cloud, their risk of cyberattack increases significantly. Ask which networks the system uses, who patches it and how remote access is controlled. These are practical questions, not published findings. For the upgrade path, ask whether devices from other makers can be added later and by whom. The HDR engineer notes that a retrofit on an open software platform can proceed in steps, starting with supervisory controllers and replacing legacy field controllers as budget allows.

Commissioning and acceptance

ISO 16484-1:2024 sets the phases of a BACS project: design, engineering, installation (installing and commissioning) and completion (handover, acceptance and project finalization). It also sets requirements for as-built documentation and training. It does not apply to operation and maintenance, or to retro-commissioning and continuous commissioning. Ask for the commissioning plan, the functional tests and the trend logs that will be delivered at acceptance, and who signs them off. See also building automation systems and indoor air quality monitoring.

Evan Mills's 2009 review of commissioning covered 643 US buildings. For new construction it found median whole-building energy savings of 13%, with a median payback of 4.2 years; for existing buildings the medians were 16% and 1.1 years. These figures cover commissioning in general, which includes more than automation systems. Where ventilation wastes energy lists the faults a good acceptance test should catch.

Get ready for the BACS regulation without changing your existing HVAC infrastructureOptimize indoor climate and energy efficiency without changing your existing infrastructure