Three checks are worth making for ventilation control in mild weather: whether the economizer opens, whether heating and cooling work against each other, and whether empty rooms still get full airflow. The first two are equipment questions. The third is about occupancy, and ventilation control that runs on a schedule cannot answer it, because school breaks, leave periods and days with fewer people at work leave rooms empty without changing the clock.

Economizers: check that the outdoor-air damper opens

An economizer is a duct and damper arrangement with automatic control that allows a cooling system to supply outdoor air to reduce or eliminate mechanical cooling during mild or cold weather. That is the ASHRAE Standard 90.1-2004 definition, as quoted in re-tuning training from Pacific Northwest National Laboratory (PNNL-SA-85063). The same training gives the working rule: in cooling mode, as long as the outdoor air is cooler than the return air, it should be used, and in humid climates when it is 5°F to 10°F below return air. Mild weather is the season in which the damper should be doing the work.

The PNNL training lists a jammed or frozen outdoor-air damper, a broken or disconnected linkage, a nonfunctioning actuator and a malfunctioning temperature sensor among the failure modes. In an ACEEE Summer Study paper (2014), Kristin Heinemeier of the University of California, Davis reports a survey of about 20 California commercial building contractors, who said that 30% to 40% of the time they find the economizer disabled with the outdoor-air dampers closed. The paper's table of earlier field studies lists failure rates from 43% to 100%. Three of its 12 entries are personal communications, and the lowest rate counts only damper faults. The paper also says working economizers can provide on the order of 20% to 30% cooling energy savings in California climates. It focuses on rooftop units, and the survey covers one state and records what contractors perceive, so none of these figures gives a failure rate for another building.

The check is short. The PNNL Re-tuning Measure Guide (PNNL-SA-183964, April 2023) says to trend outdoor air temperature, return air temperature, mixed air temperature and the outdoor-air damper command for a sample of air handlers, and to confirm the damper opens beyond its minimum position when outdoor air is more than 2°F cooler than return air. Without a building management system (BMS), the unit itself can be inspected. PNNL's training for small and medium buildings (PNNL-SA-92685) lists checking the economizer linkages and damper blades, and checking that during favorable times to economize the damper is open, partially to fully. The article on spotting HVAC faults without a BMS covers more of this kind of check.

Heating and cooling at the same time

Mild days sit between the heating and cooling setpoints, which is where systems can fight. The Re-tuning Measure Guide says zones should not alternate between heating and cooling, and suggests trending zone temperature, damper command and heating valve command for a few sample zones. PNNL's small building training says that where heating and cooling setpoints are as close as 1°F, they should be widened, for example to a heating setpoint of 72°F or lower and a cooling setpoint of 75°F or higher.

Simultaneous heating and cooling is a documented finding in practice. Evan Mills of Lawrence Berkeley National Laboratory (LBNL) reviewed commissioning in 643 US commercial buildings across 26 states (2011) and lists it among the deficiencies found and corrected. The review reports a median whole-building saving of 16% for existing buildings from correcting all the identified problems together, and it does not say how often each deficiency occurred.

Minimum airflow links this to empty rooms. PNNL's literature review of March 2012 (PNNL-21281) says excess minimum flow in a terminal box causes reheat and fan energy waste, and that installers often set the minimum at 30% to 50% of maximum airflow. The Re-tuning Measure Guide recommends limiting VAV box minimums to 10% to 15% of maximum, and has a separate check of outdoor airflow against ASHRAE 62.1, so the ventilation requirement is still examined.

Ventilation control for rooms that are empty

The same PNNL review says conference rooms often receive the airflow designed for full occupancy even when empty. A US Department of Energy (DOE) federal technology alert (DOE/EE-0293, listed in a library catalog as March 2004) quotes the utilities director of Beaufort Marine Corps Air Station in South Carolina saying that an office building there was designed for 500 people and that occupancy is rarely over 100. Ventilation control that follows occupancy is aimed at this case. ASHRAE's 2019 report on research project RP-1747 says its control sequence accounts for the occupied-standby mode in Standard 62.1, which allows a zone's ventilation to be reduced to zero when the zone is detected to be empty. The sequence was tested in simulation and lab-scale tests. The article on ventilation control compares schedule, CO2 and occupancy signals.

The same DOE alert is candid about mild climates. It says applications in moderate climates may show little energy or cost saving, especially where economizers do much of the cooling, and that in dry climates such as the desert Southwest economizer operation may save more cooling energy than demand-controlled ventilation. In practice that suggests getting the economizer working first and occupancy-based ventilation control second. That ordering is a practical judgment, not a published ranking. The standards and savings studies are in the article on demand-controlled ventilation.

The schedule is the other place to look. The Re-tuning Measure Guide says to check whether federal holidays are programmed in the scheduler and describes keeping minimum outdoor air dampers completely shut on a schedule for all hours outside occupancy, and the small building training warns that a thermostat left in Hold mode may increase energy consumption needlessly.

A mild-weather check

The steps below are a practical suggestion put together from the PNNL checks above, not a published procedure.

  1. Open the damper. On a mild day, check that each outdoor-air damper opens past its minimum when outdoor air is more than 2°F cooler than return air, and look at the linkages and blades.
  2. Look for fighting. Trend zone temperature, damper and heating valve commands for a few zones, or compare setpoints floor by floor. Widen setpoints that sit 1°F apart.
  3. Find the empty rooms. Log CO2 in meeting rooms and lightly used rooms for two weeks. Rooms whose CO2 never leaves its overnight level are candidates, and their supply airflow can be compared with the design figure. How to read ventilation data in five minutes explains the overnight baseline.
  4. Read the schedule. Check holiday entries, Hold modes and the after-hours settings on fans, pumps and outdoor-air dampers.
  5. Write it down. Record what was found and what was changed, so the next mild season can be compared with this one on the same sensors.

Get ready for the BACS regulation without changing your existing HVAC infrastructureOptimize indoor climate and energy efficiency without changing your existing infrastructure